PERT Expected Time
Beta-distribution expected activity time.
Formula
tE = (a + 4m + b) / 6
Optimistic a (days)
Most Likely m (days)
Pessimistic b (days)
Results
Expected Time (days)
5.5
Std. Deviation
1.1667